PTDF · DC Power Flow

Physical Physics, Meet Financial Markets.

7-bus campus microgrid with PTDF screening. O(L) congestion checks before every trade.

Live Topology

SIMULATEDGRID · TICK 0
LINE-01 42%LINE-02 56%LINE-03 87%LINE-04 97%LINE-05 88%LINE-06 51%LINE-07 86%LINE-08 30%LINE-09 38%PTDF rejections: 0

Node Injection Override

+0.0 MW

LMP Shadow Costs

simulated
RANKBUSLMP (₹/kWh)INJ (MW)STATUS
1BUS-065.280-3.80CONGESTED
2BUS-045.120-4.50CONGESTED
3BUS-075.050-3.70CONGESTED
4BUS-054.930+1.00
5BUS-014.850+5.00CONGESTED
6BUS-034.710+2.80CONGESTED
7BUS-024.620+3.20CONGESTED
LINE-03 87% · μ=₹0.000LINE-04 97% · μ=₹0.000LINE-05 88% · μ=₹0.000LINE-07 86% · μ=₹0.000

PTDF Matrix [9 × 7]

static · f = PTDF · p
LINE01020304050607f / f_max
LINE-010.38-0.220.10-0.08-0.05-0.07-0.062.10 / 5.0 MW (42%)
LINE-020.360.09-0.20-0.06-0.05-0.08-0.062.80 / 5.0 MW (56%)
LINE-030.150.35-0.08-0.22-0.08-0.05-0.072.60 / 3.0 MW (87%)
LINE-040.140.080.33-0.06-0.07-0.35-0.072.90 / 3.0 MW (97%)
LINE-050.400.080.09-0.08-0.07-0.08-0.343.50 / 4.0 MW (88%)
LINE-060.120.100.050.280.10-0.07-0.581.80 / 3.5 MW (51%)
LINE-070.110.070.12-0.05-0.060.29-0.483.00 / 3.5 MW (86%)
LINE-080.050.040.030.18-0.380.060.021.20 / 4.0 MW (30%)
LINE-090.040.030.05-0.040.350.18-0.611.50 / 4.0 MW (38%)