PTDF · DC Power Flow
Physical Physics, Meet Financial Markets.
7-bus campus microgrid with PTDF screening. O(L) congestion checks before every trade.
Live Topology
SIMULATEDGRID — · TICK 0
LINE-01 42%LINE-02 56%LINE-03 87%LINE-04 97%LINE-05 88%LINE-06 51%LINE-07 86%LINE-08 30%LINE-09 38%PTDF rejections: 0
Node Injection Override
+0.0 MW
LMP Shadow Costs
simulated| RANK | BUS | LMP (₹/kWh) | INJ (MW) | STATUS |
|---|---|---|---|---|
| 1 | BUS-06 | 5.280 | -3.80 | CONGESTED |
| 2 | BUS-04 | 5.120 | -4.50 | CONGESTED |
| 3 | BUS-07 | 5.050 | -3.70 | CONGESTED |
| 4 | BUS-05 | 4.930 | +1.00 | — |
| 5 | BUS-01 | 4.850 | +5.00 | CONGESTED |
| 6 | BUS-03 | 4.710 | +2.80 | CONGESTED |
| 7 | BUS-02 | 4.620 | +3.20 | CONGESTED |
LINE-03 87% · μ=₹0.000LINE-04 97% · μ=₹0.000LINE-05 88% · μ=₹0.000LINE-07 86% · μ=₹0.000
PTDF Matrix [9 × 7]
static · f = PTDF · p| LINE | 01 | 02 | 03 | 04 | 05 | 06 | 07 | f / f_max |
|---|---|---|---|---|---|---|---|---|
| LINE-01 | 0.38 | -0.22 | 0.10 | -0.08 | -0.05 | -0.07 | -0.06 | 2.10 / 5.0 MW (42%) |
| LINE-02 | 0.36 | 0.09 | -0.20 | -0.06 | -0.05 | -0.08 | -0.06 | 2.80 / 5.0 MW (56%) |
| LINE-03 | 0.15 | 0.35 | -0.08 | -0.22 | -0.08 | -0.05 | -0.07 | 2.60 / 3.0 MW (87%) |
| LINE-04 | 0.14 | 0.08 | 0.33 | -0.06 | -0.07 | -0.35 | -0.07 | 2.90 / 3.0 MW (97%) |
| LINE-05 | 0.40 | 0.08 | 0.09 | -0.08 | -0.07 | -0.08 | -0.34 | 3.50 / 4.0 MW (88%) |
| LINE-06 | 0.12 | 0.10 | 0.05 | 0.28 | 0.10 | -0.07 | -0.58 | 1.80 / 3.5 MW (51%) |
| LINE-07 | 0.11 | 0.07 | 0.12 | -0.05 | -0.06 | 0.29 | -0.48 | 3.00 / 3.5 MW (86%) |
| LINE-08 | 0.05 | 0.04 | 0.03 | 0.18 | -0.38 | 0.06 | 0.02 | 1.20 / 4.0 MW (30%) |
| LINE-09 | 0.04 | 0.03 | 0.05 | -0.04 | 0.35 | 0.18 | -0.61 | 1.50 / 4.0 MW (38%) |